Geo Sec Hydro-Cooled Crypto Mining Project: The Turnkey Solution
A turnkey solution for a highly efficient, scalable, and cost-effective Bitcoin mining
operation using hydro-cooling technology to enhance performance and profitability.
 
															P O W E R & I N F R A S T R U C T U R E
- Continuous 24/7 Operation
- Required Capacity: 1.2MW peak usage (1.33MW including all systems)
- Voltage: 3-phase 380–415V, 50Hz
- Cooling Load Flow: 100 m³/h water circulation
- Dry Cooler Capacity: 1200KW,300,000 m³/h airflow
S I T E R E Q U I R E M E N T S
- Near high-voltage substations with spare capacity
- Industrial zoning and fiber connectivity
- Climate: Avg. 26.5°C (Max), Sea-level
- Room for expansion and infrastructure like grid upgrades, batteries, etc.
F I N A N C I A L S N A P S H O T
- CAPEX: $1.2M (incl. container, equipment, cooling, power setup)
- OPEX: ~$99.8K/year (maintenance, power costs assumed negligible in draft)
- Revenue Potential: ~$1.026M/year at 95% rental capacity with BTC at $90K
- Payback: Less than 2 years expected with favorable market conditions
T E C H N O L O G Y S T A C K
- Hydro-Cooling Container (20ft): Built-in PLC, 10-inch touchscreen, remote supervision system
- Capacity: Up to 1.26MW (with HEM2 configuration)
- Dry Cooler: 12 Fans, 4.7T Full Load, PLC control
- Operating Range: -25°C to 45°C
Direct linkage to high-capacity grid access points and dedicated fiber-optic lines is critical to
sustaining 24/7 operations, minimizing downtime, and enabling remote control systems to function effectively.
 
															 
															 
								